Note: Verona Marble Company will manufacture your shower base to the dimensions given on the order form. Your shower base will be within a 1/4” tolerance of the dimensions given on the order form.
Step 1
Stud-Stud Measurements: Measure the opening of the shower area between studs. Measure the stud to drain center off 3 walls.
Step 2
Adjust Measurements: Reduce “stud-stud” measurements to allow for a ¼” space between the outside perimeter of the shower base and the stud. The ¼” space allows the shower base to be re-positioned in all directions if necessary.
Step 3
Entering Measurements: Enter the adjusted measurements on the order forms. IMPORTANT: Be sure to adjust the drain center measurements to allow for the ¼” adjustment.